In the electromagnetic flowmeter installation and debugging stage there will be some failures, below, we will understand the specific causes of the failure at this stage and their elimination methods.
Electromagnetic flowmeter is widely used in the industrial field, in order to make the electromagnetic flowmeter work stable and reliable, accurate measurement, installation needs to be installed in accordance with the correct method.
The requirements of the straight tube section of the electromagnetic flowmeter are very important to ensure the accuracy and stability of the measurement results. The following is a detailed analysis of the requirements of the straight pipe section before and after the electromagnetic flowmeter: