How to correctly select the installation point of the electromagnetic flowmeter
1.choose a straight pipe filled with liquid, such as the vertical section of the pipeline (flow from the bottom up is appropriate) or a horizontal pipe filled with liquid (the lowest place in the entire pipeline is appropriate), during the installation and measurement process, there should be no non-full pipe.
2.electromagnetic flowmeter measurement position should be selected in the upstream greater than 5D and downstream 3D straight pipe section.
3.the measurement point selection should be as far away from the pump, valve and other equipment as possible to avoid its interference with the measurement.
4.the selection of measuring points should be as far away as possible from high-power radio, strong magnetic field interference sources.